Day One: Demolition
Jenn and I started early in the morning by taking down the shower doors, the door track, the towel bar (that constantly spills our towels to the floor), part of the cabinet, etc.

IMG_0519

Then Jhenn and Andrew came over and we went to work:

IMG_0530

IMG_0536

Andrew, with the help of Master Sawsall, discovered that builders prefer Michelob. And then prefer to drop their bottles in walls and seal them up.

IMG_0539
Jhenn and Jenn made short work of the floor. I -- clearly the most masculine of the group -- made dinner.

IMG_0545

Thus ended Day One. Day Two was largely left to the plumber. Or so I thought...

IMG_0548